Zahn Periodontal

As real estate land value plunged in 2008, it was very challenging to obtain financing for a medical office development on a small site. As a result of direct conversations between the lender’s appraiser and the architect, lower level medical lease space was added to take advantage of a sloping site, and provided an increase in appraised value of $90,000. Adding lower level lease space was highly beneficial for the Owner. The increased appraised value of the real estate asset was higher than anticipated construction cost; therefore, the bank was pleased to approve a construction loan for the Owner.

  • According to Alex Sooting-Kim Pang, Stanford Professor and author of the book Rest, the effective work week is approximately (20 hours), opposed to a 40-80 hours. Productivity and intense focus over short periods of time must be balanced with rest, relaxation, and recovery. We are creating a third environment - conducive to creativity and enhanced productivity to align remote and office workers

  • Research shows remote workers feel isolated, so we partnered with Cisco WebEx to deliver advanced mobile workstations and video conferencing for hybrid offices. Cisco’s technology shaped our Hybrid Office of the Future design, enhancing communication between on-site and remote teams.

  • The architects coordinated directly with Beldon Brick Company to create a custom selection of additional colors to enhance the Meadow Blend color palate. Meadow Blend is typically created as a sand mold brick; however, we asked Beldon to create a custom brick form to enhance brick edges. The architect negotiated brick pricing directly with Beldon, purchased by the mason to eliminate a standard mark-up from the general contractor.

    During the design process, architects worked directly with the mason, to successfully modify exterior limestone panels to cast concrete panels. An excellent quality solution that saved approximately $5,000 in construction cost.

  • The architects worked directly with Pella Corporation to order low-e, insulated glass window units and doors, to reduce solar heat gain, and to eliminate the markup typically charged by the general contractor.

    Operable vent windows are strategically located on the North and South Elevations to provide natural cross-ventilation in warm months of the year.

  • Underground storm water detention was modified to above ground rain gardens to significantly reduce site construction costs by $40,000.

Conceptual Design - Interior & Exterior

Design solutions can be challenging for clients to fully visualize. To address this, multiple 3-D computer design concepts were developed, offering the Owner a clear and comprehensive way to understand the intent behind each design element. These visualizations also demonstrated how individual solutions integrate cohesively, providing a holistic view of the overall project. This approach enhances communication, reduces misunderstandings, and facilitates informed decision-making throughout the design process.